CDA Upgrade for T Marzetti, Milpitas, CA

T Marzetti, Milpitas, CA

Image Credit: Forbe

Category: Food Service

Square Footage: 1,435 sq

Services Provided: Electrical, HVAC, ,Plumbing

Completion Date: 2019

Owner: T. Marzetti

Architect: F.Z. Consultants

Project Description

T. Marzetti is a food product and processing company with plants across the United States making producing items such as Texas toast, egg noodles, and veggie dips. The Milpitas branch required a replacement of two existing air compressors, removal of one air dryer, and installation of a new dryer tank in the mechanical room.

Pragmatic Professional Engineers designed and planned the installations of electrical systems serving the mechanical equipment pad. Load calculations and relevant permit drawings were created for this project. Pragmatic Professional Engineers also provided process piping design and engineering. New exhaust ducts through the roof were also sized and installed with minor framing modifications required.

Previous
Previous

Wondrous Brewery, Emeryville, CA

Next
Next

Integrated MEP Engineering for Livermore Electric Vehicle Manufacturing Facility